Rep. Scott Tipton cut the ribbon Saturday for Crow Canyon’s seven new cabins built to improve student campus living. The buildings cost $1.3 million and include bunk beds and study desks. Alongside Tipton is Crow Canyon’s executive director, Deborah Gangloff. The contractor was Brad Pierce of DLP Construction of Dolores.
The Journal
Crow Canyon’s student campus
Rep. Scott Tipton cut the ribbon Saturday for Crow Canyon’s seven new cabins built to improve student campus living. The buildings cost $1.3 million and include bunk beds and study desks. Alongside Tipton is Crow Canyon’s executive director, Deborah Gangloff. The contractor was Brad Pierce of DLP Construction of Dolores.